York, UK
2020-Ongoing
Central Hall is an iconic centrepiece building for the National Railway Museum in York, creating outstanding welcome, arrival and gallery spaces as well as improving the site’s connectivity and legibility.
Our design reflects the spirit of the great railway architecture of the 19th century, generating uplifting and jubilant spaces that celebrate the excitement and reverence for the railways. The design is based on the team’s low-tech philosophy, dramatically reducing our reliance on concrete and steel to lower embodied carbon through a beautifully crafted timber frame structure. A combination of passive design principles and active systems reduce the site wide operational carbon footprint by 80%.
Client: National Railway Museum, Science Museum Group
Location: York
Sector: Culture, Placemaking
Commissioned: 2020
Status: Stage 5
Budget: £16.5 million
GIA: 4500sqm
Structural engineer: Price & Myers
M&E engineer: Max Fordham
January 2022, Richard Waite, ‘Feilden Fowles submits plans for new National Railway Museum entrance hall’, Architects’ Journal
March 2020, Richard Waite, ‘Feilden Fowles wins National Railway Museum’s Central Hall contest’, Architects’ Journal
March 2020, ‘Feilden Fowles Wins National Railway Museum Central Hall Design Competition’, Malcom Reading Consultants